San Leonardo Station
M1 Line · Milan Metro
San Leonardo — overview

San Leonardo is named after the Milan district of the same name; in the original plans it was to be called Gallaratese 2. It opened on 12 April 1980 as the terminus of the extension from QT8, and kept that role until 1986, when the line carried on to Molino Dorino. It has a park-and-ride.
What's nearby
A residential area of Gallaratese, with a park-and-ride and surface connections towards the north-western districts.
Connections and interchanges
The surface routes stopping here change over time: check the current route with ATM.
Station facilities
Lifts and escalators can be out of service: current status is on the ATM app.
Checked against public sources · August 2026
Other stations on the M1 Rho Fieramilano branch
Frequently asked questions
San Leonardo entered service on 12 April 1980. It is part of the M1 line of the Milan metro.
San Leonardo is served by the M1 line. See the line page for the full list of stops.
The documented facilities at San Leonardo are: escalators, ticket machines, cctv, car park. Lift and escalator availability can change: check the ATM app before you travel.
From San Leonardo, M1 trains run towards Pagano and Rho Fieramilano roughly from 05:30 until 00:30; when the metro closes the NM night buses take over. Exact times for this stop are published by ATM.