Segneri Station
Line M4 · Milan Metro
Segneri — overview

Segneri is the second-to-last stop on the blue line before the San Cristoforo FS terminus, serving the via Paolo Segneri area in the south-western suburbs. Opened on 12 October 2024 with the whole San Babila–San Cristoforo section, it completes the link between the south-western quadrant and the city centre.
What's nearby
A residential quarter around via Paolo Segneri, at the south-western edge of the city, not far from the Naviglio Grande.
Connections and interchanges
The surface routes stopping here change over time: check the current route with ATM.
Station facilities
Lifts and escalators can be out of service: current status is on the ATM app.
Checked against public sources · August 2026
Frequently asked questions
Segneri entered service on 12 October 2024. It is part of the M4 line of the Milan metro.
Segneri is served by the M4 line. See the line page for the full list of stops.
The documented facilities at Segneri are: lifts, escalators, step-free route, ticket machines, cctv, toilets. Lift and escalator availability can change: check the ATM app before you travel.
From Segneri, M4 trains run towards Linate Aeroporto and San Cristoforo FS roughly from 05:30 until 00:30; when the metro closes the NM night buses take over. Exact times for this stop are published by ATM.